Study of the basic concepts of construction scheduling: scheduling techniques with a focus on Critical Path Method; CPM schedule planning, scheduling, updating and analysis. Manual procedures in scheduling are followed by computer applications.

Course ID
244
Department
Units
3
Requisites

PREREQ: CM 240 or demonstration of CM 240 exit skills

Transfer code
CSU
Credit type
Credit/Degree Applicable
Pass/Nopass
P/NP Available
Lecture hours
Lec-52.5
Has field trips
0