Overview

The Mission Center facility combines renovation of the existing four-story SFUSD Downtown High School building on Bartlett Street with construction of a new four-story building fronting on Valencia Street. Connector bridges join the new and existing buildings and an interior courtyard between the two is a main interior focal point for the Campus.

The new facility is of the highest design quality, integrating the most current technologies to successfully meet current and future curriculum requirements. The new facility respects the scale and commercial fabric of the vibrant surrounding neighborhood, and reflects the urban richness of the culture and arts in the Mission District. It enhances the existing cultural values of the community, and provides link to the community through shared facilities that include meeting and Multi-Purpose Rooms, as well as childcare in the form of a child development educational program.

The Valencia Street main entry features what is said to be the largest Tonalmachiotl in the world. Read more.

Project Budget

Total Project Budget: $93,664,321

  • 2001 Proposition A Bond Funds: $34,519,062
  • 2005 Proposition A Bond Funds: $29,498,259
  • California Community Colleges Capital Outlay Grant Funds: $29,647,000

Project Status

Completed in 2007

Occupancy / Beneficial Use

2007

Business Partners

  • Architect
Cervantes Design Associates and Kendall Young Associates Joint Venture
  • Associate Architect
ED 2 International
  • Historic Preservation Consultant
Page & Turnbull
  • Structural Engineers
SOHA Engineers
Structus Inc.
  • Mechanical Engineer
MHC Engineers
  • Plumbing & Fire Protection Engineer
Mechanical Design Studio, Inc.
  • Electrical Engineer
FW Associates
  • Lighting Consultant
JS Nolan + Associates Lighting Design, LLC
  • Civil Engineer
Olivia Chen Consultants
  • Geotechnical Engineer
Olivia Chen Consultants
  • Telecom Consultants
Angus-Hamer Networking
Smith Fause & McDonald, Inc.
  • Acoustical Consultant
Ewart A. Wetherill
  • Landscape Architect
Adrienne Wong Associates
  • Cost Consultants
Cornerstone Concilium, Inc.
Davis Langdon Adamson
  • State Funding Consultant
Cannon Facilities & Management Consulting
  • Surveyor
Telamon Engineering
  • Hazardous Materials Consultant
Hazard Management Services. Inc.
  • Project Inspector
Ballard & Watkins Construction Services
  • Special Inspection & Testing
Coverall Engineering Laboratories
  • Construction Contractor
McCarthy Building Companies, Inc.

Business Opportunities

N/A